Railways to short-terminate, divert several trains for ROB work; check details

Advertisment

In order to ensure smooth and safe execution of work related to the conversion of Ghantapara Level Crossing Gate into a Road Over Bridge (ROB), the India Railways has decided to short terminate or divert some trains passing through Odisha.

In order to ensure smooth and safe execution of work related to the conversion of Ghantapara Level Crossing Gate into a Road Over Bridge (ROB), the India Railways has decided to short terminate or divert some trains passing through Odisha.

train

Representative Pic

Bhubaneswar: In order to ensure smooth and safe execution of work related to the conversion of Ghantapara Level Crossing Gate into a Road Over Bridge (ROB), the Indian Railways has decided to short terminate or divert some trains.

The following trains will be short-terminated /short-originated and some will be diverted as detailed below:

Short-Termination / Short-Origination:

•    Train No. 18125 Rourkela–Puri Express Will be short-terminated at Angul instead of Puri from 23rd to 27th October 2025.

•    Train No. 18126 Puri–Rourkela Express Will be short-originated from Angul instead of Puri from 24th to 28th October 2025.

Diversion of Trains:

The following trains will be diverted via Angul–Talcher Road–Budhapank bypassing Talcher station during the block period:

•    20862 Ahmedabad–Puri Express on 24th October 2025.
•    18422 Santragachi–Puri Express on 24th October 2025.
•    20831 Shalimar–Sambalpur Express on 24th and 27th October 2025.
•    20807 Visakhapatnam–Amritsar Express on 24th and 25th October 2025.
•    20808 Amritsar–Visakhapatnam Express on 25th October 2025.
•    20832 Sambalpur–Shalimar Express on 23rd and 26th October 2025.

The above six express trains will have a five-minute stoppage at Talcher Road during the above period.

Related Articles
Here are a few more articles:
Read the Next Article
Subscribe